Assessed

Tri'n'Collect

star star star_half
help_outline

'Time points' are awarded according to the adequacy of the solution with the type of innovations sought by Time for the Planet. They correspond to the analysis of several factors :

  • impact potential: impact average score > 4 => 0,5 point / if > 4,15 => 1 point.
  • global consistency: all average score of the 6 selection criteria > 2,5 => 1 point.
  • the favourite: % of assessments judge the innovation as a top one to act on a global scale against greenhouse gases > 20% => 1 point
  • the targeting: validation of Time for the Planet scope of action higher than 90% => 0,5 point + innovation level of maturity is enough => 0,5 point
  • social acceptability: semantic analysis score of comments > 0 => 0,5 point/ if > 3500 => 1 point
29 assessments

Submitted to evaluations : After checking that an innovation is within the scope of the 20 issues Time for the Planet targets and that it has reached a sufficient maturity, the innovation is being assessed.

Le tri à la source des déchets de chantier en vue du réemploi et du recyclage

Lever of action
Energy efficiency
Buildings
Discover our scope of action arrow_forward
Submission date September 08, 2021 Founders Quentin Charoy Development location France

Detailed project

NB: this form is filled entirely by the ones submitting the innovation.

What is the issue addressed?

Préservation de l'environnement par la prévention des déchets et l'économie circulaire

How is the problem solved?

Nous parvenons à réemployer/recycler plus de 90% des déchets de chantier sur lesquels nous sommes présents

What is the customer target?

Constructeurs, promoteurs, artisans, aménageurs

How is this solution different?

Nous atteignons plus de 90% de recyclage